Narangba Station Park ‘n’ Ride Upgrade Begins with Extra Parking and Safety Features

Narangba station park ‘n’ ride
Photo credit: R V/Google Maps

Preparatory works have started on the upgrade of the Narangba station park ‘n’ ride, which will expand capacity and deliver new safety and accessibility improvements for commuters.


Read: Narangba Train Station Adds 100 Car Parks to Meet Rising Demand


The project, managed by the Transport and Main Roads Department on behalf of Queensland Rail, will expand the existing car park by more than 100 spaces. Once finished, the facility will increase capacity from around 380 to nearly 500, helping to ease pressure on parking in the growing Moreton Bay region.

Discover Moreton Properties
Discover Moreton Properties
Narangba station park ‘n’ ride
Project location map (Photo credit: TMR)

Early works commenced in September 2025, with activities including fencing, drainage, vegetation clearing, and setting up site access. Main construction will follow.

Join Mailing List

Local Resources

Key features and benefits

Photo credit: Google Maps

The expansion brings several upgrades aimed at improving commuter convenience and safety:

  • More parking spaces — more than 100 additional bays, increasing capacity from around 380 to nearly 500.
  • Accessible parking — four new bays will be added, increasing the number of accessible spaces in the car park to six.
  • Motorcycle parking — six new motorcycle bays will be included.
  • Safer access — a new entry point will be built off Main Street, with a left-turn lane to improve traffic flow.
  • Security upgrades — new lighting and CCTV cameras will be installed across the facility.
  • Improved connectivity — a pedestrian pathway will link the car park more directly with the station.

The new spaces will be built on vacant rail corridor land along Main Street, to the north-west of Narangba station.

Community impact

Narangba station park ‘n’ ride
Photo credit: Google Maps

Local commuters have faced overcrowded parking, particularly during peak travel times. The expansion aims to reduce overflow parking in nearby residential streets during peak periods.

By increasing overall capacity and introducing safety improvements, the expansion is expected to ease this pressure and provide a more reliable park ‘n’ ride option for the community.

The upgrades align with the role park ‘n’ ride facilities play across South East Queensland in supporting public transport and managing congestion.

Next steps

Early works commenced in September 2025, with main construction to follow. Some disruption may occur around Main Street during construction; the project page has contact details for more information.


Read: Queensland Funds Safety Upgrades in Moreton Bay Under School Transport Program


Residents and commuters can keep track of progress on the Transport and Main Roads Department website: Narangba Station Park ‘n’ Ride Expansion.

Published 26-September-2025

CLICK ANY LOGO TO SEE PUBLICATION



Discover Moreton Properties

Spread the love