Joyner Manhunt Continues After Alleged Police Car Ramming

A police manhunt remains under way in Joyner after a man allegedly rammed a police car and ran from the scene, triggering a search involving air and ground crews.



Search Begins On Youngs Crossing Road In Joyner

Police allege the incident unfolded on Youngs Crossing Road in Joyner at about 3 p.m. when a white Kia Picanto, believed to be displaying stolen number plates, struck the rear of a police vehicle. Officers had reportedly been attempting to speak with the driver of a red Commodore sedan before the collision occurred. 

Queensland Police,
Photo Credit: QPS/Facebook

After the crash, the male driver left the Picanto and fled on foot, with police alleging he ran through school grounds and backyards before officers lost sight of him.

The man being sought was described as wearing white shorts and no shirt. The Picanto was seized for forensic examination as the investigation continued. The search operation remained active beyond the initial response, with police continuing efforts to locate the man after he left the area on foot.

Police searching streets in Joyner
Photo Credit: QPS/Facebook

Air And Ground Crews Join Joyner Manhunt

Dog squad officers and PolAir crews were deployed as the search continued in Joyner. Police also conducted door-knocks while attempting to trace the man’s movements, with the operation extending into the night. Reports from the area indicated a police helicopter was heard overhead late in the evening as the search continued.



By Sunday morning, the manhunt remained ongoing. Police urged residents not to approach the man if seen and instead contact authorities. Investigators also called for anyone with relevant information, CCTV footage or dashcam vision to come forward as the Joyner search continued.

Published 31-Mar-2026

Childcare Centre Added to Neighbourhood Hub Plans in Joyner

A childcare centre has been proposed for a new neighbourhood hub development in Joyner, alongside retail and health services near a major bridge upgrade.



Retail and Services Expansion Near Youngs Crossing Bridge Site

Plans for a neighbourhood centre in Joyner have been expanded to include a new childcare facility, following a recent milestone in a major nearby transport project.

The 11-hectare site at 274 Youngs Crossing Road is already approved for shops, a service station, food and drink outlets, and a healthcare facility. The proposed change adds a dedicated childcare centre to the development.

Development Location and Site History

childcare centre
Photo Credit: DA/2025/2335

The original application for the neighbourhood centre received approval in 2022. The development area sits roughly 200 metres from the construction site of a new bridge over the North Pine River, part of ongoing upgrade works on Youngs Crossing Road.

Current structures on the land include a house, sheds, stables, storage facilities, and horse paddocks. These are expected to be cleared for the development.

Proposed Changes to Site Use

The proposed childcare centre would accommodate up to 160 children and employ around 30 staff. It is positioned near the entrance of the site.

The wider development also features a 570sqm space for healthcare use and 125 parking bays, including five for people with a disability. Discussions have taken place with Absorbent Minds Montessori Early Education regarding the childcare service.

Joyner development
Photo Credit: DA/2025/2335

Infrastructure Works at Youngs Crossing Progressing

The neighbourhood centre is located near one of the largest road upgrades in the region. The Youngs Crossing project spans more than one kilometre, from Protheroe Road to Dayboro Road, and includes a new 200-metre bridge west of the existing river crossing.

The transport corridor is being upgraded to improve flood resilience, traffic safety, and capacity, in response to population growth and increased vehicle demand. Construction activities began in July, with a principal contractor engaged to carry out major works valued at $86 million.

Total investment in the project exceeds $66 million in combined contributions.

Outlook for the Joyner Community



If approved, the childcare centre would complete the neighbourhood precinct. Both the centre and transport upgrades are expected to support access to services and improve movement across Joyner.

Published 18-July-2025