Petrie TAFE Centre of Excellence: What $60 Million will Build for Locals

Petrie students who want a career in manufacturing or the trades will soon have a purpose-built TAFE centre a short walk from the train station.



The Queensland Government announced the news this week and said Queensland company FKG Group has been appointed as contractor. Petrie is the second of four such centres to begin construction across the state. Rockhampton got going earlier this year.

What is Planned for the Site

TAFE Centre
Photo Credit: Artist Impression/ Supplied

An Advanced Manufacturing Hub sits at the heart of the plan. Around it, the government says, will be training space for metal fabrication, engineering and trades, plus instrumentation labs and rooms built for industry to work alongside students. The Department of Trade, Employment and Training lists construction, engineering and electrotechnology as the centre’s main focus.

The hub is aimed at the region’s manufacturing sector, which both the state government and the City of Moreton Bay describe as a billion-dollar industry. Designs are still subject to change, the department notes.

Why Petrie?

TAFE Centre
Photo Credit: Artist Impression/ Supplied

So why build here? Part of the answer is the land. The centre will go up at Moreton Bay Central on a site the City of Moreton Bay transferred for the project. The council says it is the third-largest local government in Australia by population, so a large pool of future students lives close by.

Nearby, the Moreton Bay Indoor Sports Centre is planned as a venue for the 2032 Olympic and Paralympic Games. Mayor Peter Flannery said the land transfer should lead to more jobs in high-demand fields and strengthen the area’s name as a hub for education and technology.

What Locals and Leaders are Saying

TAFE Centre
Photo Credit: Artist Impression/ Supplied

For Kerri-Anne Dooley, the Member for Redcliffe, the appeal is simple. Manufacturing and construction matter in her area, and a campus close to home means thousands of people can study without leaving the community. Ariana Doolan, the Member for Pumicestone, agreed and said the training should lead locals into rewarding careers.

TAFE Queensland chief executive Tim Rawlings focused on the learning itself. He said students and apprentices will get hands-on training in advanced manufacturing, construction, engineering and electrotechnology. Close ties with employers and government, he said, should keep courses in step with what workplaces need and send graduates out job-ready from day one.

Manufacturing Minister Dale Last added that a skilled workforce is key to the industry’s future growth.



Part of a Bigger Plan

TAFE Centre
Photo Credit: Artist Impression/ Supplied

Petrie is one piece of a $201.1 million state investment. The other centres are planned for the Sunshine Coast, Rockhampton and the Southern Moreton Bay Islands, where the focus will be marine training. The government describes the four centres as an election commitment.

Minister Ros Bates said communities across Queensland need more tradies and skilled workers, and that the new facility is meant to help fill those gaps while supporting housing, infrastructure and Games preparations. The government points to a predicted peak shortfall of 50,000 construction workers, though it has not said where that figure comes from.

No completion date for the Petrie centre has been announced.

Published Date 07-October-2026

Inside the Plans for Petrie’s New $60-Million TAFE

Trade workshops, an industrial simulation tower and virtual-reality training spaces are among the features planned for Petrie’s new $60-million TAFE, with the development application providing the clearest look yet at what is proposed for the Moreton Bay Central site.



The four-storey building would accommodate up to 450 students in about 5,700sqm of floor space, with training focused heavily on construction and allied trades. Plans show practical training areas on the lower levels and classrooms and specialist facilities above, including spaces for carpentry, electrical and plumbing training.

The proposed campus would be built at Moreton Bay Central, near UniSC Moreton Bay and Petrie railway station.

Funding has been committed and procurement is under way, but the project remains at the planning and tender stage. The lodgement of a development application does not mean development approval has been granted, and construction has not been confirmed as having started.

Trade Workshops Anchor the Ground Floor

Much of the hands-on training would take place at ground level, where the plans provide workshops, training areas and storage as well as a food and drink outlet.

Construction, engineering and electrotechnology have been identified as key training areas for the Petrie campus, while the funded project also includes an Advanced Manufacturing Hub. Among the more distinctive features shown in the plans is an industrial simulation tower extending through the building.

Upper levels would contain classrooms, seminar rooms, staff and student services, amenities and a student kitchen, along with specialist teaching spaces. A VR/XR hub is also included, bringing virtual and extended-reality technology into the training mix.

It is a different layout from the sprawling workshops often associated with trade training. At Petrie, practical areas, classrooms and specialist facilities would be stacked across four levels.

Room for 450 Students

The proposed TAFE has been designed for up to 450 students, with planning material indicating normal weekday operating hours of 7am to 5pm and occasional evening classes potentially continuing until 9pm.

Plans show 67 standard car bays, two accessible spaces and four motorcycle spaces, as well as parking for 29 bicycles. Provision has also been identified for another 38 car spaces if required.

The campus would sit close to Petrie railway station, giving students travelling from North Lakes and other communities along the Redcliffe Peninsula line a direct rail connection to the precinct. Wider planning for Moreton Bay Central also provides for pedestrian links between the station, education area and surrounding development.

$60 Million Across Several Years

The $60 million attached to the project is government funding to construct the Moreton Bay TAFE Centre of Excellence, rather than the value of an awarded building contract.

The original funding program provided $60 million over three years, with $6.6 million allocated to commence delivery in 2025–26. Procurement has since progressed, with four preferred contractors invited in June to tender for the first stage of the Petrie and Caloundra TAFE projects.

A builder had not been announced by 19 August, when the Department of Housing and Public Works was still listing the head contractor for the Petrie project as “yet to be appointed”.

The Government has previously forecast construction starting in 2026 and completion in 2028, subject to construction market conditions and material supply. Those dates remain the project timetable; the planning material does not establish that building work has begun.

TAFE Joins Petrie’s Education Precinct

The new campus is planned within the former Petrie paper mill precinct, where UniSC opened its Moreton Bay campus in 2020.

Moreton Bay Central has continued to develop around the university, with education, employment, recreation and other uses planned across the site. The TAFE would add a substantial vocational-training presence, particularly in construction, engineering, electrotechnology and advanced manufacturing.



For Petrie, the development application puts considerably more detail around what the new campus could look like on the ground. Subject to the remaining planning and procurement steps, workshops, classrooms, simulation facilities and digital training spaces would all be brought together in a four-storey building within walking distance of the railway station.

Published 1-September-2026